Road Closure List 30th July 2021

Ongoing Road Closures and Diversions

**N25 Eastbound and Westbound**: Lane restrictions in place until August 2021 to facilitate Dunkettle Interchange Upgrade site works (Sisks)

***N40 Dunkettle Interchange***: Lane Restrictions in place on an ongoing basis both on the circulatory carriageway and slips roads to facilitate interchange upgrade works. (Sisk)

***M8 Northbound***: Lane Restrictions in place 24hrs until August 2021 to facilitate bridge widening works for the Dunkettle Interchange Upgrade Scheme. (Sisks)

L2998 Dunkettle Road: Stop/Go in place daily 0930-1600 to facilitate bridge widening works for Dunkettle Interchange Upgrade Scheme (Sisks)

N8/N25 Westbound: Lane restrictions in place 0930-1600hrs to facilitate works to Glashaboy river bridge (Sisks)

Deane Street: Road closure in place from 0930hrs on Tuesday 25th of February 2020 until August 28th 2021 approx from is junction with Oliver Plunkett Street Lower to its junction with Clontarf Street to facilitate development of the Prism Building by CField Construction.

Henry Street: Road closure in operation 24hr from its junction with Prospect Row to its junction with Millerd Street to facilitate additional storage facilities due Covid-19 (Mercy Hospital)

Skehard Road: Upgrade works taking place until approx. November 2021 from its junction with Mahon Link Road to its junction with Church Road, Lane restrictions and Stop/Go traffic management will be in place expect delays. Footpath closures will be in place throughout the works (Coffey Northumbrian)

Sheares Street: Partial bus lane closure in place from 23rd of February 2021 until October 2021 to facilitate Mercy Hospital extension works. A temporary pedestrian walkway will be in place for the duration. (ESS Modular)

Washington Street: Footpath closure in place until August 2022 to facilitate apartment complex construction works at the old Square Deal site. alternative route provided (John Paul Construction)

Terence McSwiney Quay/Anglesea Street: A 24hr Bus Lane closure in place to facilitate the operating of the Vaccination Centre at Cork City Hall. (HSE)

North Mall/Sundays Well Road: Road closure in place from 0930hrs on Tuesday 08th of June 2021 until 1800hrs on Tuesday 31st of August 2021 from its junction with Shandon Street to its junction with Shanakiel Road to facilitate the Irish Water Cork City Water Supply Scheme Networks Upgrades Project. Local access will be maintained. Local diversions will be in place. (Farrans)

Corkerans Quay: Road Closure in place from 0930hrs Monday 5th of July until May 2022 from its junction with Watercourse Road to facilitate construction of apartment block. Local access will be maintained. Footpath access to the N20 North Link Road will also be closed and diversions will be in place. (Citidwell)

***Togher Road***: Road Closure in place from 0800hrs on Monday 05th July 2021 until 1800hrs on Friday 13th August 2021 from its junction with Spur Hill roundabout to its junction with Tramore Road roundabout to facilitate culvert construction works as part of the flood relief works. Local diversion will be in place and local access to be maintained. (MGOS)

South Douglas Road: Stop/Go will be in place from 0800-1800hrs to facilitate junction upgrade works. Temporary traffic lights will be in place outside of these hours. (Sorensen)

***N20 Northbound & Southbound: 24hr Lane restrictions in place until Friday 13th of August 2021 to facilitate resurfacing works (Lagan Asphalt)

Horgan’s Quay: Bus lane closure in place until Monday 28th of February 2022 to facilitate footpath paving works and wall demolition for Horgans Quay Development. A temporary pedestrian walkway will be in place for the duration of the closure (BAM)

 

Speed Limit Order

 

***M8/N8/N25/N40 Dunkettle Interchange***: In accordance with Section 10 of the Road Traffic Act, 2004 Cork City Council hereby wishes to advise that a Road Works Speed Limit Order has been made on the Dunkettle Interchange M8/N8/N25/N40 and associated slip roads. as per the synopsis below:

 

1. N25/N8 Mainline Westbound:

  • A proposed 60 KPH special works speed limit to apply (in place of the existing 100KPH speed limit) on the N25 Westbound from the intersection with the City/County Boundary Line (E: 173,851.379, N: 72,308.071) to the Eastern side of the Dunkettle Roundabout on the N8 (E: 172,718.265, N: 72,715.030).

 

2. N8/N25 Mainline Eastbound:

  • A proposed 60 kph special works speed limit to apply (in place of the current speed limit of 100KPH) on the N8 Mainline Westbound from a point just East of the Dunkettle Roundabout (E: 172,716.535, N: 72,729.563) to the intersection of the N25 Eastbound with the City/County Boundary Line (E: 173,852.065, N: 72,329.915).

 

3. M8/N40 Mainline Southbound:

  • A proposed 60 kph special works speed limit to apply (in place of the current speed limit of 80/100KPH) on the M8/N40 Mainline Southbound from a point 1400m North of Dunkettle Interchange (E:173797.10, N:73756.08) to a point 800m south of Jack Lynch Tunnel (E:173152.31, N:70926.81)

 

4. N40/M8 Mainline Northbound:

  • A proposed 60 kph special works speed limit to apply (in place of the current speed limit of 80/100KPH) on the N40/M8 Mainline Northbound from a point 800m south of Jack Lynch Tunnel (E:173136.23, N:70.924.26) to a point 1400m North of Dunkettle Interchange (E:173776.50, N:73754.56)

 

5. R623 Off Ramp:

  • A proposed 60 kph special works speed limit to apply (in place of the current speed limit of 80/100KPH) on the R623 off Ramp from where it diverges from the N40 (E:173323.74, N:72393.90) to its junction with Richmond (E:173311.06, N:72268.28)

 

6. N25/M8 Slip Road Northbound:

  • A proposed 60 kph special works speed limit to apply (in place of the current speed limit of 80/100KPH) on the N25/M8 Slip Road and circulatory carriageway from the N25 Westbound intersection with the City/County Boundary Line (E: 173,851.379, N: 72,308.071) to a point 1400m North of Dunkettle Interchange (E:173776.50, N:73754.56)

 

7. N8/N40 Slip Road Southbound:

  • A proposed 60 kph special works speed limit to apply (in place of the current speed limit of 80/100KPH) on the N8/N40 Slip Road and circulatory carriageway from Dunkettle Roundabout (E:172716.535, N:72729.563) to a point 800m south of Jack Lynch Tunnel (E:173152.31, N:70926.81)

 

8. N40/N25 Slip Road Eastbound:

  • A proposed 60 kph special works speed limit to apply (in place of the current speed limit of 80/100KPH) on the N40/N25 Slip Road and circulatory carriageway from a point 800m south of Jack Lynch Tunnel (E:173136.23, N:70.924.26) to the intersection of the N25 Eastbound with the City/County Boundary line (E: 173,852.065, N: 72,329.915).

 

9. M8/N8 Slip Road Westbound:

  • A proposed 60 kph special works speed limit to apply (in place of the current speed limit of 80/100KPH) on the M8/N8 Slip Road and circulatory carriageway from a point 1400m North of Dunkettle Interchange (E:173797.10, N:73756.08) to the Dunkettle Roundabout (E:172718.265, N:72715.030)

 

10. L-3004 Merge/Diverge Slip Roads:

  • A proposed 60 kph special works speed limit to apply (in place of the current speed limit of 80/100KPH) on the L-3004 Merge/Diverge Slip Roads from the start of the merge slip road (E:173616.13, N:72841.30) to the intersection of the L-3004 diverge Eastbound with the City/County Boundary line (E: 173,852.869, N: 72,338.320).

The proposed special speed limit order will apply temporary speed limits at the above location from 10th February 2021 until 27th January 2022

  

*** M8 Mainline ***: In accordance with Section 10 of the Road Traffic Act, 2004 Cork City Council hereby wishes to advise that a Road Works Speed Limit Order has been made on the M8 Motorway Northbound and Southbound as per the synopsis below:

 

1. M8 Mainline Southbound:

  • A proposed 60 kph special works speed limit to apply (in place of the current speed limit of 100KPH) on the M8 Mainline Southbound from chainage marker 141.5 (E: 573638.3431, N: 574551.22) to chainage marker 142.3 (E:573753.901, N:573818.201)

 

2. M8 Mainline Northbound:

  • A proposed 60 kph special works speed limit to apply (in place of the current speed limit of 100KPH/60KPH under current temporary speed limit starting at this point) M8 Mainline Southbound from chainage marker 142.3 (E:573731.882, N:573818.923) to chainage marker 141.5 (E: 573626.0296, N: 574556.642)

 

The proposed special speed limit order will apply temporary speed limits at the above location from 22nd of February 2021 until 03rd of September 2021

 

***N20*** In accordance with Section 10 of the Road Traffic Act, 2004 Cork City Council hereby wishes to advise that a Road Works Speed Limit Order has been made on the N20 Northbound & Southbound as per the synopsis below:

 

1. N20 Mainline Northbound:

  • A proposed 60 kph special works speed limit to apply (in place of the current speed limit of 80/100KPH) on the N20 Mainline Northbound from the start of the existing 80kph zone (E:566443.7, N:574472.9) which is located 45m North of the signalised junction with Parklands Drive, to a point located 450m North of the R617 Flyover (E: 562267.92, N: 575999.085)

 

2. N20 Mainline Southbound:

  • A proposed 60 kph special works speed limit to apply (in place of the current speed limit of 80/100KPH) on the N20 Mainline Southbound from a point located 450m North of the R617 Flyover (E: 562275.593, N: 576010.462), to the start of the existing 60kph zone (E: 566451.8, N: 574484.5) which is located 45m North of the signalised junction with Parklands Drive,

 

3. N20/L2797 Northbound off Slip:

  • A proposed 60 kph special works speed limit to apply (in place of the current speed limit of 80/100KPH) on the N20/L2797 Northbound off Slip, from the start of the existing 80kph zone (E:566443.7, N:574472.9) which is located 45m North of the signalised junction with Parklands Drive, to the start of the existing 50kph zone on the off slip (E:566177.5, N: 574727.3)

 

4. N20/L2797 Northbound on Slip:

  • A proposed 60 kph special works speed limit to apply (in place of the current speed limit of 100KPH) on the N20/L2797 Northbound on slip, from start of the existing 100kph zone (E:566011.9, N:574797.2), to a point located 450m North of the R617 Flyover (E: 562267.92, N: 575999.085)

 

5. N20/L2787 Northbound off Slip:

  • A proposed 60 kph special works speed limit to apply (in place of the current speed limit of 80/100KPH) on the N20/L2787 Northbound off slip, from the start of the existing 80kph zone (E:566443.7, N:574472.9) which is located 45m North of the signalised junction with Parklands Drive, to a point on Kiln Road approx. 85m East of the end of the off slip (E:565083.4, N: 574868.5)

 

6. N20/L2787 Northbound off Slip:

  • A proposed 60 kph special works speed limit to apply (in place of the current speed limit of 80/100KPH) on the N20/L2787 Northbound off slip, from the start of the existing 80kph zone (E:566443.7, N:574472.9) which is located 45m North of the signalised junction with Parklands Drive, to a point on Kiln Road approx. 75m West of the end of the off slip (E:564925.8, N: 574889.1)

 

7. N20/L2787 Northbound on Slip:

  • A proposed 60 kph special works speed limit to apply (in place of the current speed limit of 100KPH) on the N20/L27987 Northbound on slip, from start of the existing 100kph zone (E:564191.5, N:575200.9), to a point located 450m North of the R617 Flyover (E: 562267.92, N: 575999.085)

 

8. N20/R617 Northbound off Slip:

  • A proposed 60 kph special works speed limit to apply (in place of the current speed limit of 80/100KPH) on the N20/R617 Northbound off slip, from the start of the existing 80kph zone (E:566443.7, N:574472.9) which is located 45m North of the signalised junction with Parklands Drive, to the end of the start of the existing 60kph zone (E:562349.049, N: 575608.554)

 

9. N20/R617 Northbound on Slip (Blarney):

  • A proposed 60 kph special works speed limit to apply (in place of the current speed limit of 80/100KPH) on the N20/R617 Northbound on slip, from the start of the existing 80kph zone (E:562322.062, N:575611.2), to a point located 450m North of the R617 Flyover Flyover (E: 562267.92, N: 575999.085)

 

10. N20/R617 Northbound on Slip (roundabout):

  • A proposed 60 kph special works speed limit to apply (in place of the current speed limit of 80/100KPH) on the N20/R617 Northbound on slip, from the start of the slip at the roundabout (E:562563.627, N:575653.798), to a point located 450m North of the R617 Flyover Flyover (E: 562267.92, N: 575999.085)

 

11. N20/R617 Southbound off Slip:

  • A proposed 60 kph special works speed limit to apply (in place of the current speed limit of 80/100KPH) on the N20/R617 Southbound off slip, from a point located 400m North of the R617 Flyover (E: 562275.593, N: 576010.462), to the start of the existing 80kph zone on the off slip (E:562349.049, N: 575608.554)

 

12. N20/R617 Southbound on Slip:

  • A proposed 60 kph special works speed limit to apply (in place of the current speed limit of 80/100KPH) on the N20/R617 Southbound on slip, from the start of the existing 80kph zone (E:562322.062, N:575611.2), to the start of the existing 60kph zone (E: 566451.8, N: 574484.5) which is located 45m North of the signalised junction with Parklands Drive,

 

13. N20/L2785 Southbound off Slip:

  • A proposed 60 kph special works speed limit to apply (in place of the current speed limit of 100KPH) on the N20/L2785 Southbound off slip, from a point located 400m North of the R617 Flyover (E: 562275.593, N: 576010.462), to the start of the existing 50kph zone on the off slip (E: 564605.6, N: 575045.4)

 

14. N20/L2785 Southbound on Slip:

  • A proposed 60 kph special works speed limit to apply (in place of the current speed limit of 80/100KPH) on the N20/R617 Southbound on slip, from start of the existing 100kph zone (E:564685, N:574976.7), to the start of the existing 60kph zone (E: 566451.8, N: 574484.5) which is located 45m North of the signalised junction with Parklands Drive,

 

15. N20/L2786 Southbound off Slip:

  • A proposed 60 kph special works speed limit to apply (in place of the current speed limit of 100KPH) on the N20/L2786 Southbound off slip, from a point located 400m North of the R617 Flyover (E: 562275.593, N: 576010.462), to the start of the existing 60kph zone (E: 566220.8, N: 574905.9)

 

16. N20/L2786 Southbound on Slip:

  • A proposed 60 kph special works speed limit to apply (in place of the current speed limit of 80/100KPH) on the N20/R617 Southbound on slip, from the start of the on slip (E:566235.257, N:574795.223), to the start of the existing 60kph zone (E: 566451.8, N: 574484.5) which is located 45m North of the signalised junction with Parklands Drive,

 

17. L2789 Kiln Road Eastbound:

  • A proposed 60 kph special works speed limit to apply (in place of the current speed limit of 80KPH) on the L2789 Eastbound, from a point approx. 75m West of the N20 off Slip (E:564925.7, N:574900.8), to a point approx. 85m East of the N20 off Slip (E: 565083.4, N: 574868.5),

 

18. L2789 Kiln Road Westbound:

  • A proposed 60 kph special works speed limit to apply (in place of the current speed limit of 80KPH) on the L2789 Westbound, from a point approx. 85m East of the N20 off Slip (E:565679.5, N:574856.6), to a point approx. 75m West of the N20 off Slip (E: 564925.8, N: 574889.1),

 

The proposed special speed limit order will apply temporary speed limits at the above location from 09th of July 2021 until 13th of August 2021

 

 

Daily Road Closures & Diversions

Friday 30th of July 2021

Hardwick Street: Road Closurein place from 0930-1600hrs from its junction with Leitrim Street to its junction with St Patrick Hills to facilitate water connection works. Local diversions will be in place and local access will be maintained. (Coffey Northumbrian)

Wellington Road: Footpath closure in place to facilitate upgrade works as part of the CCMS advanced works. Alternative routes will be provided. (MGOS)

Patricks Place: Road closure (Eastbound only) in place from 0930hrs Monday 26th of July until 1800hrs Friday 30th of July from its junction with St Patricks Hill to its junction with Sidney Hill to facilitate upgrade works as part of the CCMS advanced works. Local diversions will be in place. (MGOS)

R639 Sallybrook: Stop/Go will be in place from 0930-1900hrs to facilitate footpath improvement works. (Conhor Construction)

Assumption Road: Stop/Go in place 0800-1800hrs to facilitate footpath and pedestrian crossing works. (Cumnor)

College Road: Stop/Go will be in place 0930-1800hrs to facilitate footpath improvement works. (Martin O’Callaghan)

Horgan’s Quay: Bus lane closure in place until Monday 28th of February 2022 to facilitate footpath paving works and wall demolition for Horgans Quay Development. A temporary pedestrian walkway will be in place for the duration of the closure (BAM)

East Village, Douglas: Road Closure in place (Northbound only) from 0930 – 1800hrs from its junction with the R610 (Ulster Bank) to its junction with East Village to facilitate ESB ducting works (Nodwells)

R639, Glanmire: Stop/Go in place from 1930-0600hrs to underground ducting works. (KNN/NBI)

 

Saturday 31st of July 2021

N/A

 

Sunday 01st of August 2021

Kennedy Quay: Road closure in place from 0600-2000hrs from its junction with Albert Quay to its junction with Mill Road to facilitate the LGBT+ Pride Festival Drive-in Party. Local access will be maintained. (CCC/Drainage)

  

Monday 02nd of August 2021

Wellington Road: Footpath closure in place to facilitate upgrade works as part of the CCMS advanced works. Alternative routes will be provided. (MGOS)

Tuesday 03rd of August 2021

Kerry Road: Road Closurein place from 0930hrs Tuesday 03rd of August 2021 until 1800hrs Friday 03rd of September 2021 its junction with the R617, Tower to its junction with Vicarstown Cross to facilitate new sewer connection works. Local diversion will be in place. Local access to be maintained. (Coffey Northumbrian)

Wellington Road: Footpath closure in place to facilitate upgrade works as part of the CCMS advanced works. Alternative routes will be provided. (MGOS)

Patricks Place: Road closure (Eastbound only) in place from 0930hrs Tuesday 03rd of August 2021 until 1800hrs Friday 06th of August 2021 from its junction with St Patricks Hill to its junction with Sidney Hill to facilitate upgrade works as part of the CCMS advanced works. Local diversions will be in place. (MGOS)

R618, Inniscarra Road: Road Closure in place from 0930-1800hrs from its junction with Coolroe to its junction with R579, Leemount Cross to facilitate road resurfacing works. Local access to be maintained. Local diversion will be in place. (Lagan)

R639 Sallybrook: Stop/Go will be in place from 0930-1900hrs to facilitate footpath improvement works. (Conhor Construction)

Assumption Road: Stop/Go in place 0800-1800hrs to facilitate footpath and pedestrian crossing works. (Cumnor)

College Road: Stop/Go will be in place 0930-1800hrs to facilitate footpath improvement works. (Martin O’Callaghan)

R639, Glanmire: Stop/Go in place from 1930-0600hrs to underground ducting works. (KNN/NBI)

East Village, Douglas: Road Closure in place (Northbound only) from 0930 – 1800hrs from its junction with the R610 (Ulster Bank) to its junction with East Village to facilitate ESB ducting works (Nodwells)

Halfmoon Lane: Road Closure in place from 0800-1800 from its junction with the South Douglas Road to facilitate service diversion works as part of the junction upgrade works. Local access will be maintained through Tramore Valley Park. (Sorensen)

North Mall: 4-way stop/go in place 1930-0600hrs to facilitate watermain installation works. (Farrans)

R639 Sallybrook: Stop/Go will be in place from 0930-1900hrs to facilitate footpath improvement works. (Conhor Construction)

Blackrock Road: Stop/Go will be in place from 0930-1600hrs to facilitate ESB ducting works as part of the Passage Greenway Improvement Scheme. (Ward and Burke)

 

Wednesday 04th of August 2021

Kerry Road: Road Closurein place from 0930hrs Tuesday 03rd of August 2021 until 1800hrs Friday 03rd of September 2021 its junction with the R617, Tower to its junction with Vicarstown Cross to facilitate new sewer connection works. Local diversion will be in place. Local access to be maintained. (Coffey Northumbrian)

Wellington Road: Footpath closure in place to facilitate upgrade works as part of the CCMS advanced works. Alternative routes will be provided. (MGOS)

Patricks Place: Road closure (Eastbound only) in place from 0930hrs Tuesday 03rd of August 2021 until 1800hrs Friday 06th of August 2021 from its junction with St Patricks Hill to its junction with Sidney Hill to facilitate upgrade works as part of the CCMS advanced works. Local diversions will be in place. (MGOS)

R618, Inniscarra Road: Road Closure in place from 0930-1800hrs from its junction with Coolroe to its junction with R579, Leemount Cross to facilitate road resurfacing works. Local access to be maintained. Local diversion will be in place. (Lagan)

R639 Sallybrook: Stop/Go will be in place from 0930-1900hrs to facilitate footpath improvement works. (Conhor Construction)

Assumption Road: Stop/Go in place 0800-1800hrs to facilitate footpath and pedestrian crossing works. (Cumnor)

College Road: Stop/Go will be in place 0930-1800hrs to facilitate footpath improvement works. (Martin O’Callaghan)

R639, Glanmire: Stop/Go in place from 1930-0600hrs to underground ducting works. (KNN/NBI)

East Village, Douglas: Road Closure in place (Northbound only) from 0930 – 1800hrs from its junction with the R610 (Ulster Bank) to its junction with East Village to facilitate ESB ducting works (Nodwells)

Halfmoon Lane: Road Closure in place from 0800-1800 from its junction with the South Douglas Road to facilitate service diversion works as part of the junction upgrade works. Local access will be maintained through Tramore Valley Park. (Sorensen)

North Mall: 4-way stop/go in place 1930-0600hrs to facilitate watermain installation works. (Farrans)

Blackrock Road: Stop/Go will be in place from 0930-1600hrs to facilitate ESB ducting works as part of the Passage Greenway Improvement Scheme. (Ward and Burke)

Anglesea Street: Lane Restrictions in place 1930-0600hrs to facilitate site investigation works for watermain installation (Ward and Burke)

Catherine Street & Keeffe Street: Road Closure in place from 0800-1800hrs from its junction with Morrisons Quay to facilitate sewer survey and jetting works as part of the Moores Hotel development. Local access will be maintained and local diversions will be in place. (Elliott Group)

Wood Street/ Lynchs Street: Road Closure in place from 0600-0800hrs from its junction with Washington Street to facilitate surveying and cleaning works to sewers. (CCC/Drainage)

Barrington Avenue: Road Closure in place from 0900-1700hrs from its junction with Blackrock Road to facilitate road crossing for watermain repair works. (CCC/Water)

   

Thursday 05th of August 2021

Kerry Road: Road Closurein place from 0930hrs Tuesday 03rd of August 2021 until 1800hrs Friday 03rd of September 2021 its junction with the R617, Tower to its junction with Vicarstown Cross to facilitate new sewer connection works. Local diversion will be in place. Local access to be maintained. (Coffey Northumbrian)

Wellington Road: Footpath closure in place to facilitate upgrade works as part of the CCMS advanced works. Alternative routes will be provided. (MGOS)

Patricks Place: Road closure (Eastbound only) in place from 0930hrs Tuesday 03rd of August 2021 until 1800hrs Friday 06th of August 2021 from its junction with St Patricks Hill to its junction with Sidney Hill to facilitate upgrade works as part of the CCMS advanced works. Local diversions will be in place. (MGOS)

R618, Inniscarra Road: Road Closure in place from 0930-1800hrs from its junction with Coolroe to its junction with R579, Leemount Cross to facilitate road resurfacing works. Local access to be maintained. Local diversion will be in place. (Lagan)

R639 Sallybrook: Stop/Go will be in place from 0930-1900hrs to facilitate footpath improvement works. (Conhor Construction)

Assumption Road: Stop/Go in place 0800-1800hrs to facilitate footpath and pedestrian crossing works. (Cumnor)

College Road: Stop/Go will be in place 0930-1800hrs to facilitate footpath improvement works. (Martin O’Callaghan)

East Village, Douglas: Road Closure in place (Northbound only) from 0930 – 1800hrs from its junction with the R610 (Ulster Bank) to its junction with East Village to facilitate ESB ducting works (Nodwells)

R639, Glanmire: Stop/Go in place from 1930-0600hrs to underground ducting works. (KNN/NBI)

Halfmoon Lane: Road Closure in place from 0800-1800 from its junction with the South Douglas Road to facilitate service diversion works as part of the junction upgrade works. Local access will be maintained through Tramore Valley Park. (Sorensen)

North Mall: 4-way stop/go in place 1930-0600hrs to facilitate watermain installation works. (Farrans)

Blackrock Road: Stop/Go will be in place from 0930-1600hrs to facilitate ESB ducting works as part of the Passage Greenway Improvement Scheme. (Ward and Burke)

Anglesea Street: Lane Restrictions in place 1930-0600hrs to facilitate site investigation works for watermain installation (Ward and Burke)

Fitton Street: Road Closure in place from 0800-1800hrs from its junction with Fr Mathew Street to its junction with Morrisons Quay to facilitate sewer survey and jetting works as part of the Moores Hotel development. Local access will be maintained and local diversions will be in place. (Elliott Group)

  

Friday 06th of August 2021

**N25 Eastbound**: Road Closure in place from 2000hrs Friday 06th of August 2021 until 0500hrs Monday 09th of August 2021 from its junction with the N40 off ramp to its junction with the N40 on ramp to facilitate replacement of waterproofing to existing bridge structures as part of the Dunkettle Interchange Upgrade Scheme. Diversions will be via the Dunkettle interchange. Delays expected. (Sisk)

Kerry Road: Road Closurein place from 0930hrs Tuesday 03rd of August 2021 until 1800hrs Friday 03rd of September 2021 its junction with the R617, Tower to its junction with Vicarstown Cross to facilitate new sewer connection works. Local diversion will be in place. Local access to be maintained. (Coffey Northumbrian)

Wellington Road: Footpath closure in place to facilitate upgrade works as part of the CCMS advanced works. Alternative routes will be provided. (MGOS)

Patricks Place: Road closure (Eastbound only) in place from 0930hrs Tuesday 03rd of August 2021 until 1800hrs Friday 06th of August 2021 from its junction with St Patricks Hill to its junction with Sidney Hill to facilitate upgrade works as part of the CCMS advanced works. Local diversions will be in place. (MGOS)

R618, Inniscarra Road: Road Closure in place from 0930-1800hrs from its junction with Coolroe to its junction with R579, Leemount Cross to facilitate road resurfacing works. Local access to be maintained. Local diversion will be in place. (Lagan)

R639 Sallybrook: Stop/Go will be in place from 0930-1900hrs to facilitate footpath improvement works. (Conhor Construction)

Assumption Road: Stop/Go in place 0800-1800hrs to facilitate footpath and pedestrian crossing works. (Cumnor)

College Road: Stop/Go will be in place 0930-1800hrs to facilitate footpath improvement works. (Martin O’Callaghan)

Halfmoon Lane: Road Closure in place from 0800-1800 from its junction with the South Douglas Road to facilitate service diversion works as part of the junction upgrade works. Local access will be maintained through Tramore Valley Park. (Sorensen)

North Mall: 4-way stop/go in place 1930-0600hrs to facilitate watermain installation works. (Farrans)

Blackrock Road: Stop/Go will be in place from 0930-1600hrs to facilitate ESB ducting works as part of the Passage Greenway Improvement Scheme. (Ward and Burke)

  

 

Road Closures due to Events

Saturday 31st of July 2021

All Ireland Senior Hurling Championship- Páirc Uí Chaoimh: Tipperary v Waterford Hurling – Throw-In: 1:30pm, Please follow link for match day info: http://paircuichaoimh.ie/pairc-ui-chaoimh-match-day-info/

    

Sunday 01st of August 2021

Cork LGBT+ Pride Festival: Ticketed drive-in party taking place on Kennedy Quay from 3:00pm. Please follow link for further information: https://corkpride.com/calendar/cork-pride-party-at-the-port/

 

 



 

 
 

 

************************************************************************************************

Cork City Council thanks you for your co-operation and apologises for the disruption that may be caused by these works. Please find all these closures and other information on Cork City Councils Website https://www.corkcity.ie/roadworks

************************************************************************************************